Eight stages, each with a date

The boring part is the part that protects your date

Nine to thirteen weeks on site, about five of them without a sink. Here is exactly what happens in each stage and what we need from you to keep it moving.

Bright modern kitchen featuring blue cabinetry, marble countertops, and ample natural light through large windows.

Credentials and record

  • 214Scottsdale kitchens delivered
  • 4.9Average from 186 reviews
  • 91%Finished on the contract date
  • 14Years, kitchens only
  • AZ ROC licensed#000000, sample placeholder
  • $2M general liabilityCertificate on request
  • NKBA member studioSample credential
  • EPA Lead-Safe certifiedRequired pre-1978 homes
  • 5 year workmanship warrantySample term
  • 30 day realignment visitOn every project
The measured survey and the plan set, before anything is bought
Chapter 1The measured survey and the plan set, before anything is bought
Selections closed in the materials library under 2700K
Chapter 2Selections closed in the materials library under 2700K
Zip wall, negative air and the services roughed to our sheet
Chapter 3Zip wall, negative air and the services roughed to our sheet
Cabinetry scribed level, stone templated, punch list closed
Chapter 4Cabinetry scribed level, stone templated, punch list closed

01

Nothing is bought, nothing is torn out. This is where the aisles, the triangle and the elevation are decided.

Drawing

  1. 01

    Consultation 90 minutes

    At your kitchen or the studio. We measure, photograph and talk about how the room fails you now. You leave with a written scope direction and an investment band.

  2. 02

    Survey and plan 2 weeks

    A measured survey to the eighth of an inch, then a plan, four elevations and a first materials direction. This is where the aisles, the triangle and the elevation get decided.

02

Every selection closes here. It is the single biggest predictor of whether a kitchen lands on its date.

Deciding

  1. 03

    Selections 2 to 4 weeks

    Slab yard visit, cabinetry samples in your own light, hardware in your hand, appliance model numbers confirmed. Everything closes before demolition. Everything.

  2. 04

    Contract and permit 2 to 3 weeks

    Fixed price, dated milestones and a written schedule. We submit for permit under our own licence and handle the HOA package where one applies.

03

Protection first, then demolition, then the services. Blocking and box heights are set now or not at all.

Opening up

  1. 05

    Demolition 3 to 5 days

    Zip wall, negative air, floor protection and the temporary kitchen set up before anything comes out. Daily wipe-down of the route to the truck.

  2. 06

    Rough-in 1 to 2 weeks

    Plumbing, mechanical and electrical to our rough-in sheet, then inspection, then drywall. Blocking and box heights are set now or not at all.

04

Cabinetry scribed level, stone templated digitally, then the punch list closed with a date on it.

Finishing

  1. 07

    Cabinetry and stone 3 to 5 weeks

    Boxes set and scribed level within 1/16 in over the run, stone templated digitally, seams agreed in writing, install and plumb-in.

  2. 08

    Finish and punch 2 to 3 weeks

    Tile, paint, flooring transitions, lighting trim, appliance fit. Written punch list closed within 10 business days, and we return at 30 days to re-align.

05

The thing everyone complains about

Dust control, in four measures we actually run

Kitchen demolition makes fine dust and fine dust travels on the air handling system. We cannot make it disappear. We can keep it in one room.

  • Negative-air machine

    HEPA-filtered, running from the first hour of demolition to the last day of finishing.

  • Zip wall at the opening

    Sealed at floor and ceiling, with a zipped door so the crew is not taping and re-taping plastic.

  • Return vents taped

    In the kitchen and in every adjacent room, so the air handler does not distribute fine dust through the whole house.

  • Daily wipe-down

    The route from the kitchen to the truck is wiped at the end of every working day, not at the end of the job.

06

Five weeks without a sink

The temporary kitchen goes in before the old one comes out

  • Your existing refrigerator relocated to the laundry, garage or dining corner, on a circuit we have checked.
  • A folding counter at 36 in with a microwave, a kettle and an induction hob plate.
  • Two labelled bins: dishes for the laundry sink, and recycling.
  • A box of the twenty things you use daily, packed by you rather than by us.
  • Written dates for the day the sink goes and the day it comes back.

07

Straight answers

Questions about the build itself

Not covered here?

Call the studio and speak to a designer, not a call centre. If we cannot answer it on the phone we will say so.

(480) 555-0204Read the full FAQ

If plumbing, gas or electrical circuits move, yes. A like-for-like refacing job does not. We pull permits under our own licence and meet every inspector on site, in Scottsdale, Phoenix, Paradise Valley, Fountain Hills and Cave Creek.

Negative-air machine with HEPA filtration, zip wall at the kitchen opening, taped return vents in adjacent rooms, floor protection on the route to the truck and a wipe-down at the end of each working day.

One site supervisor, on your project, who you have met before the first day. Trades rotate; the supervisor does not.

We return at 30 days to re-align doors and drawers as everything settles, which is normal in any new cabinetry. Beyond that, our sample workmanship warranty runs 5 years and the cabinetry warranty is per the manufacturer.

Finished kitchen by Lumen Kitchen Design

Book the survey. Get the drawings.

Ninety minutes at your kitchen, a measured survey and a written scope direction you can act on with or without us.

Design fee credited against your project. Consultations booking 3 to 4 weeks out.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.